Post-tensioning system,
Bridge construction
Brücke E221
build a 45-meter-long bridge section per superstructure and per week. In total, over 2,000 t of BBV L19 tendons were installed for the internal prestressing, approx. 26 t per construction section. In order to be able to cope with this amount in the shortest possible time, prefabricated tendons were used[...]