Post-tensioning system,
Bridge construction
Sava Brücke
The cable-stayed bridge crossing the Sava River with a length of 929 m and a considerable carriageway width of 45 m has been the new landmark of the city of Belgrade since its completion in 2012. The bridge superstructure was built in prestressed concrete in the backspan and sidespan area and in steel construction in the mainspan area. Porr Technobau und Umwelt AG was […]