Post-tensioning system,
Bridge construction
Strengthening of Inn bridge, Eggelfing/Obernberg
The approximately 380-metre-long bridge over the River Inn was built in 1963. The original bridge construction was constructed as a double webbed T-Beam with additional pressure zones near the axis of the river supports. Due to the increased traffic loading, the bridge was required to be structurally reinforced with post-tensioned bar tendons. Work commenced in August […]