Post-tensioning system,
Tunnelling
Marieholmstunnel
limit the width of the cracks during the swimming and lowering process. 22 BBV L22 tendons with bond were installed per element. The BBV started the prestressing work on the first element at the beginning of 2017 and the work on the third element was completed by mid-2018. The tunnel was completed and handed[...]