BW K 28/1, NB ÜF ÖFW, A 94 over B 12

Short description

The BW K 28/1 bridge carries the B12 over the A94 in the Pocking district. The 52-meter-long prestressed concrete superstructure was constructed using prestressed tendons manufactured on site by BBV Systems GmbH.

The project

The BW K 28/1 bridge carries Federal Highway B12 over the A94 highway in the Pocking district.

The bridge, approximately 52 m long, consists of a single span and was constructed as a prestressed concrete structure.

For the superstructure, BBV Systems GmbH manufactured the tendons directly on-site and performed the prestressing and grouting.

The use of prestressed concrete construction resulted in a durable and cost-effective structure that ensures safe traffic flow.

Services in detail

  • Prestressing Technology, Bridge Construction:
    • Internal strand tensioning method with post-tensioning
    • Tension members manufactured, installed, tensioned, and grouted on site
    • Per superstructure: 63 metric tons of prestressing steel; 48 BBV L22 tendons each