Underground car park Luitpoldplatz Bayreuth

Bayreuth, Germany

Start of construction: September 2020

Renovation of the underground car park.

TG Lyonel-Feiningerstraße Munich

München, Germany

Start of construction: February 2017

The underground car park is a single-storey, roughly 12-year-old reinforced concrete structure with a total of 47 parking spaces.

Parking garage P 301 Daimler Sindelfingen

Sindelfingen, Germany

Start of construction: January 2017

The damage survey showed that the parking garage was in urgent need of repair

UCP Tax Office Mannheim

Mannheim, Germany

Start of construction: September 2015

The underground car park is located in the basement of the building and has two congruent levels.

Ludwig Erhard Bridge, Ulm

Ulm, Germany

Start of construction: June 2015

The Ludwig Erhard Bridge, built in 1989, spans the northern area of the station with a length of 295 meters and a width of 21 meters.

TG Syrlinstrasse

Ulm, Germany

Start of construction: October 2014

The tests carried out on the floor slab and ramp showed cracks in large areas that could not be bridged by the applied surface protection system.

Schwabengarage, Stuttgart

Stuttgart, Germany

Start of construction: September 2014

The draft of the cathodic corrosion protection system with protective current (repair principle "K" according to RiLi of the DAfStB) is based on the specifications of the planning engineering office.

TG Marktoberdorf

Marktoberdorf, Germany

Start of construction: July 2014

The repair concept for the renovation of the reinforced concrete components, protection of the support and wall bases, provides for the principle "K" (cathodic corrosion protection) according to RL-SIB 2001 of the German Committee for Reinforced Concrete (DAfStb).

Altstadtringtunnel Munich

München, Germany

Start of construction: July 2013

In the course of preliminary investigations for a planned repair of the Altstadtring Tunnel, the material properties of the built-in prestressing steel should be determined.

UCP Kaufland Möhringen

Möhringen, Germany

Start of construction: May 2013

In the underground car park, considerable pollution was found in some cases, particularly in the crack area in the ceiling above the 2nd basement level.

Kaufland Biberach an der Riss

Biberach an der Riss, Germany

Start of construction: October 2012

In the run-up to the repair of the beams of the department store, a conventional repair of the exposed parking deck (10,500 m2) was already carried out.

TG "N6-Altes Haus", Mannheim

Mannheim, Germany

Start of construction: September 2012

The constant entry of de-icing salt in winter through the parked vehicles led to severe corrosion with pitting, especially in the area of ​​the upper frame reinforcement.

TG Prinzregentenplatz

München, Germany

Start of construction: July 2012

The static reserves of the corroded reinforcement were determined through intensive preliminary investigations by the expert planner, so that the repair principle "K" - cathodic corrosion protection - was selected.

Ruegen bridge

Rügen, Germany

BBV Systems was entrusted with the metrological check of the cables.