Map view
Results: 18

Klosterwall Hamburg

Hamburg, Germany

Start of construction: January 2020

New construction of a quarter in the "Kontorhausviertel".

Zuidelijke Ringweg, Groningen

Groningen, Netherlands

Start of construction: January 2019

The southern bypass of the Dutch city of Groningen is about twelve kilometers long. The contract for the expansion of the southern ring road was awarded to the consortium Combinatie Herepoort.

Überseequartier Hamburg

Hamburg, Germany

Start of construction: January 2017

Construction pit for 3 basement floors in diaphragm wall construction.

Wehrhahn Line, Lot 1

Düsseldorf, Germany

Start of construction: July 2007

The state capital Düsseldorf is realizing the so-called core section of the Wehrhahn Line as an underground tram route to improve local public transport. With the new double-track tunnel route, which is a replacement for 5 above-ground tram lines, a sustainable increase in the attractiveness of local public transport as well as the possibility of urban planning and other traffic-related improvements in the route area will be achieved.

Tower 99

Frankfurt a.M., Germany

Start of construction: January 2019

As part of the high-rise project Tower 99 West in Frankfurt am Main with 4 basement floors, a 17 meter deep excavation pit was created.

DB Tower

Frankfurt a.M., Germany

Start of construction: January 2019

The DB Tower project in the Europaviertel in Frankfurt am Main consists of a 60 m high-rise building with an adjacent plinth on a continuous 3-storey basement.

Arge Fair construction pit north

Darmstadt, Germany

Start of construction: January 2017

The FAIR (Facility for Antiproton and Ion Research) construction project in Darmstadt included a new international accelerator facility for research with antiprotons and ions.

NEG Museum Island

Berlin, Germany

Start of construction: May 2012

For the construction pit and foundation of the new entrance building, the James-Simon-Galerie, BBV Systems was commissioned with the production and delivery of approx. 16,000 m of BBV injection piles.

Scharpitz trough structure

Scharpitz, Germany

Start of construction: May 2012

New construction of the transfer structure 2952-08 of the DB-AG on the island of Rügen.

Nordhavnsvej

Kopenhagen, Denmark

Start of construction: March 2012

North of Copenhagen, a new 3 km long road connection ("Northern Harbor Link- '") between Nordhavn and Helsingørmotorvejen was built.

Bulow Carre

Stuttgart, Germany

Start of construction: April 2011

Construction of an office and administration building in Stuttgart.

Sheraton

Doha, Australia

Start of construction: March 2011

BBV Systems Co. Ltd. supplied anti-buoyancy anchors in the form of mini piles for the Sheraton Park project in Doha.

Tanzende Türme

Hamburg, Germany

Start of construction: February 2010

Two skyscrapers at the eastern entrance to the Reeperbahn in Hamburg are referred to as "dancing towers".

X-FEL tunnel

Hamburg, Germany

Start of construction: August 2009

The European XFEL is a 3.4 km long facility with which extremely high-energy laser light can be generated.

Large power station Mannheim

Mannheim, Germany

Start of construction: June 2009

Construction of a coal-fired power plant block to ensure long-term electricity and district heating generation